Take the futuro challenge

To see what you could save

Calculate how much you will save

We erected a 10m long and 4m high scaffold installation, with two 2.5m returns, two full boarded lifts and one ladder access point, two scaffolders complying with SG4:10 and using the scaffolders step method took: 3 hours 51minutes 45seconds using tube and fittings.

How long will it take you and how much will you save?

Number of workers

1 worker
20 workers
Number of workers: 1

Timescale

1 Hour
100 Hours
Number of hours: 1

You could save 0 hours and £0*

*Based on an average scaffolder wage

Share your saving on:

We erected a 10m long and 4m high scaffold installation, with two 2.5m returns, two full boarded lifts and one ladder access point, two scaffolders complying with SG4:10 and using the scaffolders step method took: 2 hours 15 minutes 26 seconds using a Genlok scaffold.

How long will it take you and how much will you save?

Number of workers

1 worker
20 workers
Number of workers: 1

Timescale

1 Hour
100 Hours
Number of hours: 1

You could save 0 hours and £0*

*Based on an average scaffolder wage

Share your saving on:

The Futuro Challenge has been created to show you how much time and money you could be saving by using Futuro; compared to tube and fitting and other modular system scaffolds. The challenge works out how much money you could be saving on labour costs based on the average scaffolder wage due to the quicker erection time.

At Generation we cannot deny the advantages that Futuro has to offer in the ever-changing world of Scaffolding, so we thought it was only fair to share with you the reasons why we love Futuro.

The proof is in the figures!

To erect a 10m long and 4m high scaffold installation, with two 2.5m returns, two full boarded lifts and one ladder access point, two scaffolders complying with SG4:10 and using the scaffolders step method took:

  • 1 hour 05minutes 31seconds using Generation Futuro
  • 2hours 15minutes 26seconds using a Lok scaffold
  • 3hours 51minutes 45seconds using tube and fittings

Futuro is manufactured to the highest standards and is compliant with the requirements of the NASC CoP product audit. Speak to our experts about how this can work for you!

Don't believe us...? Take a look at this video.

Speak to our experts to find out more